Heading Page
Titelseiten 1
Vorwort 3
Sonstiges 4
Inhaltsverzeichnis 5
Rubrik: Opening Session 11
Artikel: The swedish road system on the threshold of the 21st century 11
Artikel: IABSE Colloquium "Tunnel strcutures 1998" 20
Rubrik: Session 1: Current and planned projects 21
Artikel: The stockholm urban road tunnels - an overall status report 23
Artikel: Central artery project technical overview 33
Artikel: Construction of Trans-Tokyo Bay Highway 43
Artikel: Optimizing the construction method if a surface tunnel south of Vienna 49
Artikel: A50 Blythe Bridge to Longton - Meir Tunnel 57
Artikel: Planning of tunnel structures for mass rapid transport system, Delhi 63
Rubrik: Session 2A: Structural design - soil and foundation 69
Artikel: Computational model and charts for cut-and-cover tunnels 71
Artikel: Over-crossing concrete tunnels in Arlandabanan 87
Article: Underpinning of Red Line South station 93
Article: Study on practical application of the MMST method 99
Article: Basel's new motorway link to France - tunnel construction under inner-city conditions 105
Article: The design of the Øresund tunnel anchored ramps 111
Article: Challenging use of immersed tubes in the Fort Point Channel, Boston, MA 117
Article: Geotechnical instrumentation supporting central artery construction 125
Article: Reliabiility-based design method for cut-and-cover tunnels 131
Rubric: Session 2B: Structural design - structural engineering 137
Article: The Øresund tunnel - "Design and build" in practice 139
Article: Design of reinforcement to control cracking due to imposed strains 151
Article: Numerical modelling of prefabricated segmental tunnels under embankments 157
Article: Development of Wing Segments 163
Article: Full scale live load tests on a corrugated steel culvert 169
Article: Øresund tunnel - control of early age cracking 175
Article: Cut-and-cover tunnels at the Arlanda link 181
Article: Evaluation of steel-concrete composite structures applied for multi-micro shield tunnel 187
Article: Design of tunnel structures and linings for ice pressure 193
Article: The design of the Western Harbour Crossing, Hong Kong 203
Article: The design of the Western Immersed Tube Tunnel, Hong Kong 209
Rubric: Session 3: Fire - prediction and mitigation 215
Article: Fire protection in traffic tunnels: resu of EUREKA research project "EU 49 FIRETUN" 217
Article: Full-scale fire tests as part of risk analyses 225
Article: Probabilistic fire analysis, Limfjordstunnel, Denmark 231
Article: Risk analysis and safety concept: Norra and Södra Länken 237
Article: Fire safety cheking of tunnels based on probabilistic analysis 245
Article: Fire Hazard Mitigation for the Øresund Link Immersed Tunnel 251
Rubric: Session 4: Security and environmental aspects 263
Article: Risk analysis as a tool to determine designe load due to explosion in a tunnel 265
Article: Security aspects of the new railway link with Brussels Airport 277
Article: Cut-and-cover tunnel a karst environment 289
Article: Seismic design for large-scale cut-and-cover tunnels 295
Article: Environmental consideratios for highway tunnels 307
Article: Ventilation combined with air cleaning technology for particels and NOx for road tunnels 313
Article: Managing impacts of ground movement in urban tunneling 319
Article: Influence of road enclosure structures on ventialtion 327
Article: Hazard and risk analysis in the design and construction of tunnels in carbonate rock mass of the adriatic area 333
Rubric: Session 5: Construction 341
Article: Construction of elements for the Øresund immersed tunnel 343
Article: Deep soil-cement mixing for CA/T project 355
Article: Discrete supports in submerged tunnels 367
Article: Safe backfilling due to finite element precalculations 373
Article: Railway tunnel under Sydhavn Station 379
Article: Laong distance underpass construction beneath railway 385
Article: Advantages of british steel bi-steel in immersed tunnel construction 395
Article: Soldier pile tremie concrete walls as part of the final tunnel structure 405
Rubric: Session 6: Maintenance and repair 413
Article: Maintenance and repair : keynote address 415
Article: Repair of the Linfjord tunnel, Denmark 431
Article: An effective and eternal maintenance method for concrete tunnel structures 439
Article: Reconstruction of the Dewey Square tunnel 445
Article: The prediction of the costs of maintenance 451
Article: Laser scanning for tunnel state assessment 457
Article: Concrete pavements in tunnels 469
Article: Rehabilitation of two existing tunnels in West Malaysia: a case study 475
Article: Rehabilitation work for the upheaval disaster at underground station caused by the groundwater rising 485